0
点赞
收藏
分享

微信扫一扫

【设计模式-2.4】创建型——抽象工厂模式

戴老师成长记录仪 2023-12-18 阅读 44
sprint
Which course does this assignment belong to2301-MUSE社区-CSDN社区云
What are the requirements for this assignmentbeta Sprint
The goal of this assignmentTo summarize the beta task progress and the team's sprints
Team NameThemis
Top-of-the-line collection of essays Linkclick here
Other referencesCSDN、《The Practice of Project Construction》

Catalogue

I. Overview of task completion during the Beta sprint

II. Overview of member contributions

III. Improvement plan and implementation measures

IV. Link to project source code

V. Project function display:

VI. Reflections of the participants:


I. Overview of task completion during the Beta sprint

Task DetailTask Completion
Task 1Optimize the UI interface to make it more beautiful and user-friendly100%
Task 2 In the personal home module, add a page for self-help questions and answers100%
Task 3Complete the backend programming for searching the inventory.100%
Task 4Developer testing and real machine testing are performed based on all user usage scenarios100%

II. Overview of member contributions

Student IDNameTask DescriptionContribution
832101125Jie HuangBackend(Searching) + Blog writing

100%

832101128Daming FuBackend(Searching+Comment) + Blog writing100%
832101121Weijie HongFrontend (Q&A creating) + Blog writing100%
832101220Siqi LinUser interface improvement + Blog writings + Front-end testing120%
832101108Jiayi LuTest + Blog writing100%
832101109Hongming ChenTest documentation writing100%
832101116Wenxuan ZhouUser perception information collection + User questionnaire writing + Blog writing100%
832101202Zhipeng WangUser perception information collection + User questionnaire writing + Blog writing100%
832101211Xinyun LiDefense ppt production100%
832101217Zhaoqing LinDefense ppt production100%
832101207Yuyang HuaDefense ppt production100%

III. Improvement plan and implementation measures

In Alpha Stage Issues Summary Essayand Prediction Essay---THEMIS we mentioned that the unfinished part of the project mainly includes

  • User side: The UI is a bit shabby and could be optimized again. Set self-service Q&A interface to make it more friendly to new users;
  • Back-end: continue to improve the user search leasing module and comment module; 
  • In terms of test, the scene test and multi-device real machine test of user partial cancellation operation were not carried out.

Implementation measures:

  • UI: searched for more novel ICONS, replaced the corresponding ICONS, and changed the application color matching that conforms to the aesthetic of college students; See A for details
  • Self-service Q&A interface: Refer to the open source works in the wechat Cloud development competition, and set the self-service Q&A interface based on this. See A for details
  • Search item module: Browse similar open source projects on Github and write the search logic suitable for this project. General implementation of comments and delete module writing.
  • In terms of testing, multi-model testing is realized through real machine testing in wechat developer tools, and development side testing is completed through testing tools.

IV. Link to project source code

Link to pre-beta source code:GitHub - 0128130Raven/EE308_Team: Final

Link to post-beta source code:THEMIS_Beta_Sprint_Project

V. Project function display:

Note: 

  • The UI has adjusted the overall color scheme and some ICONS, but only part of the UI is shown here to keep the blog simple.
  • Check out the following blogs for more information on user usage and software testing

Frequently Qusetion Answer:

Home Page:

Good List Page:

Search page:

Comment Module:

VI. Reflections of the participants:

Jie Huang:

Daming fu:

Siqi Lin:

Weijie Hong:

Wenxuan Zhou:

Zhipeng Wang:

Jiayi Lu:

Hongming Chen:

Xinyun Li:

Zhaoqing Lin:

Yuyang Hua:

举报

相关推荐

0 条评论